Media

CIMR Beam Tests

40-ft-long full-scale AASHTO I beam prestressed with 0.6 in. CFCC strands

40-ft-long half-scale complete bridge model prestressed with 0.6 in. CFCC strands

40-ft-long full-scale AASHTO I beam prestressed with 0.7 in. CFCC strands

40-ft-long full-scale AASHTO I beam prestressed with 0.7 in. CFCC strands

40-ft-long full-scale decked bulb T beam prestressed with 0.7 in. CFCC strands

40-ft-long full-scale decked bulb T beam prestressed with 0.7 in. CFCC strands

MDOT Visit to Lawrence Tech's Nabil Grace Center for Innovative Materials Research

Carbon Fiber Research at Lawrence Technological University

Name Dedication

M-102

Brush Street over I-94

Beam construction with 0.6 in. CFCC as the main prestressing strands.

M86

Beam placement over the supports.

CIMR Dedication - 2008